- Disconnect power from source before installing, modifying or service
- All strands of the cable shall go into the terminal o each phase with required torque.
- Load line termination should be as per the markings provided on the MCB/Isolator
- In critical case of contact welding the front toggle does not indicate the Off position.
- Not to be pushed forcefully down